Unpacking and handling
Acceptance inspection
1.2 Acceptance inspection
1.2.1 Identification
The identification plates, located at (X), state the carriage type, serial number,
delivery date, etc.
Figure 2 Identification plates (X)
1.2.2 Contents
As standard the track motion includes the following on delivery:
1.2.3 Inspection
Unpack the equipment and check for any visible transport damage. If this is the case,
contact ABB.
1.2.4 Cleaning
Before transport the equipment has been protected against rust by a thin film of oil
that has been applied before packing. This film must be wiped away before
installation.
1. Wipe off any surplus oil using a lintless cloth.
2-2
• One carriage (with adaptor when applicable) with drive unit
The carriage weighs approximately: 600 kg. (+ possible adaptor, 160/193 kg)
• Stand modules and cable chain
The track motions with a travel length greater than 4.7 m are designed with
several stand modules interconnected during installation.
• Mounting bolts and guide sleeves
Mounting bolts with washers and guide sleeves for the robot.
Action
3HEA 800 970-001 Rev. D, Mars 2006