2. Delivery inspection and acceptance

On receipt, immediately check integrity of the
packing,confirm if the shipping document is in
allegiance with the order.
The accompanying documents in the shipping
packing are:
• instruction manual (this document)
• test report
• certificate of qualification
• shipping document
To remove the contactor from the packing,
proceed as follows:
• Open the plastic bag
• Remove the contactor, avoiding any kind of
mechanical stress to the insulating parts 、
contact arms, contact finger and terminals etc.
• Use the special lifting tools for the
withdrawable version
• Check the technical parameter of nameplate
and make sure to match order confirmation and
shipping notification
If product is damaged or does not conform to the
order, notify ABB (directly or through the agent or
supplier) as soon as possible but no later than
five days of receipt. Only valid order information
confirmed by ABB at the time of order shall be
provided in the package