6.4.3

Do an inspection of the PE connection

Preliminary requirements
Procedure
1. Use a multimeter to make sure that the terminals X1-1 and X1-2 are not earthed.
2. If the terminals are earthed, then contact the manufacturer. Refer to 1.11.
6.4.4

Connect the 120 V cable for the precommissioning mode

Preliminary requirements
Procedure
 
1. Install the ferrules on the wires. Refer
to section 6.3.16.
2. Loosen the screws of the terminal
block X-1.
3. Connect the wires to the terminals.
4. Tighten the screws to the correct torque. Refer to section 12.4.
HVC 200/300/360-EN | 002
Only do this procedure
when a different
procedure refers to this
procedure.
Only do this procedure
when a different
procedure refers to this
procedure.
Torque screwdriver, cross
Wire cutter
Wire stripper pliers
Crimp pliers
Wire
L1 wire (A)
Neutral wire (B)
PE wire (C)
AC single-phase cable. Refer
to section
12.13.4
Ferrules
D
E
F
Connect to terminal
X1-1 (D)
X1-2 (E)
X1-3 (F)
Installation
C
B
A