Objective and purpose
This document describes the planning, installation, commissioning and
maintenance of the XC1003-A extinguishing control unit. Please follow the
instructions carefully, to ensure correct reliable use.
Area of application
The information contained in this document is valid as of hardware/software
version 2.7.
Target group
This documentation and the instructions contains are addressed to the following
groups of people who perform the activities and hold the qualifications shown.
Activity
Responsible for local product management for the
relevant product line and for the information
exchange between the site supplying the
equipment and the RC. Co-ordinates the
information flow between the individual groups for
a project.
Responsible for local project management. Co-
ordinates on-time use of all groups and resources
involved in a project. Responsible for ongoing
acquisition of technical information required for
project realization.
Parameterizes the product or equipment or system
in the RC for a specific country or customer.
Monitors the serviceability of the product or
equipment or system and releases it for
commissioning at the place of installation.
Diagnoses and eliminates operating faults and
errors.
Installs and mounts the product or devices or
system components at the place of installation.
After installation, conducts a general performance
check of the installation.
Customer-specific configuration of the product or
device or system at the place of installation.
Checks serviceability and officially releases the
product or device or system for operation by the
operator/customer. Diagnoses and eliminates
operating faults and errors.
Performs all maintenance procedures listed in the
product documentation and checks the product for
correct functioning.
About this document
Qualification
Has the technical training and has completed the
training courses appropriate to his function and
to the product line.
Has the technical training appropriate to his
function and the dimensions of the project or the
product line deployed in the project and has
attended the training courses for project
managers at the supplier's works.
Has the technical training appropriate for
parameterizing the products or devices or
systems and has attended the technical training
course for Project Engineers at the plant
supplying the equipment.
Technical training in the area of building
automation and electrical installations.
Has the technical training appropriate to the
function and the products or devices or systems
to be commissioned and has attended the
technical training course for commissioning
personnel.
Has the technical training appropriate to the
function and the product.