Panasonic FP2 ET-LAN Technical Manual page 159

Table of Contents

Advertisement

Case 2-2
When the auto connection function is used (Configurator ET is used) and connection setting is
performed using the Configurator ET:
The following settings are required using the ladder program.
When the initialization processing is set using the Configurator ET, the auto initialization processing is
automatically conducted without setting the initialization processing using the ladder program.
When setting the connection required for open processing is performed using the Configurator ET, the
open processing (auto connection open processing) is automatically conducted without setting the open
processing using the ladder program.
Setting item
Internal relay allocation
Initialization processing
Open processing
Data transfer
- Setting using the setup tool (Configurator ET)
Setting the connection using the setup tool (Configurator ET)
To set the open processing using the setup tool (Configurator ET), confirm that a check mark is NOT
placed in "The connection 1 to 8 are set by ladder program" check box.
Setting the initialization processing using the Configurator ET
Classification
Initialization
Initialization
processing
information
setting
Open
Connection
processing
setting
Setting method
Ladder program
Configurator ET
Configurator ET
Ladder program
Setting item
Source node
Source node IP address
setting
Communication between
networks
Source node MEWTOCOL
station No.
Time setting
Transparent communication setting
Connection
Open method
information
setting
(Connection 1)
Source node port No.
Destination node IP
address
Destination node port No.
Destination node
MEWTOCOL station No.
Connection closing time
Number of re-open times
Description
192.168.1.1
Not used
1
Default
Default
MEWTOCOL
communication
TCP/IP: Fullpassive open
8000
192.168.1.2
8000
5
1
255
10-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp2-et1Fp2-et2Afp27901Afp2790

Table of Contents