Panasonic FP2 ET-LAN Technical Manual page 157

Table of Contents

Advertisement

- Setting using the ladder program
Internal relay and data register allocation required for the ladder program are as shown below.
Internal relay allocation
Classification of processing
Complete signal area
Request signal area
Data register allocation
Classification of
processing
Open processing
Data transfer
processing
Data transfer area
Device number
R0 to R1F
R40 to R5F
Device number
Setting item
DT20
Open method
DT21
Source node port No.
DT22 to DT23
Destination node IP address
DT24
Destination node port No.
DT25
Destination node
MEWTOCOL station No.
DT22 to DT23
Source node route No.
Destination node
MEWTOCOL station No
Number of transferred
words
DT100 to DT102
Transfer data writing area
Device used in program example
RC: Initialization complete signal
R0: Initialization error signal
R11: Open error signal (Connection 1)
R4C: Initialization request signal
Settings used in the
program
MEWTOCOL communication
TCP/IP: Full Passive open
8000
192.168.1.2
(C0A80102H)
8000
05
1
05
3
10-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp2-et1Fp2-et2Afp27901Afp2790

Table of Contents