2. Commissioning
3
1
Modules grouped in subfolders in the Device Catalog
2
Pay attention to the symbol of the mouse pointer (see point 3 in the text)
3
Configured modules
Fig. 2/13: Configuration with drag & drop. (The Device Catalog" is usually displayed in
PC WORX below the Bus Structure" window.)
Festo P.BE−CPX−SF34+SF35−E N en 1007NH
2
3. Pay attention to the symbol of the mouse pointer when
configuring. The modules are entered in the correct
sequence in the list only when the lower symbol appears
(see fig. left). Always drag the next module to the last
configured module.
4. The sequence of the configured modules (from top to
bottom) must correspond to the sequence of the modules
in the CPX terminal (from left to right).
1
2−27