To Next IBC TB2-4 (Battery Detect Common)
4 4 . . 4 4 . . 2 2 I I n n s s t t a a l l l l i i n n g g B B a a t t t t e e r r y y S S h h u u n n t t T T r r i i p p I I n n t t e e r r f f a a c c e e C C o o n n n n e e c c t t i i o o n n s s
NOTE 1
NOTE 2
NOTE 3
To install wiring:
1.
If wiring the IBC shunt trip interface terminals using the line-up-and-match inter-cabinet wiring access
pass-through (see
top entry access, proceed to
access, proceed to
NOTE
2.
Line-Up-and-Match Wiring. Route the battery shunt trip interface wiring from the UPS battery shunt trip
interface terminals through the bottom inter-cabinet access pass-through (see
cabinet and IBC to the wiring channel on the left side of the IBC (see
wiring channel to the IBC battery interface terminal block TB2. See
Table
7, and
Installation and Operation manual listed in paragraph
locations.
3.
Secure the interface wiring to the wire tie anchors (see
4.
Proceed to
40
Eaton 93PM Integrated Battery Cabinet-Small (IBC-S) Installation Manual 164000305—Rev 06
Thermal Sensor
Thermal Sensor Return
Not Used
Battery Detect
Not Used
Battery Shunt Trip -
Battery Shunt Trip +
Disconnect terminal block plug from terminal block to wire plug.
Because of the battery shunt trip wiring route in the 93PM UPS cabinet, the wiring from
the IBC shunt trip terminals to the UPS must use wire rated for 600V and Class 1 wiring
methods.
If the inter-cabinet wiring access pass-through is not used to install the battery shunt trip
interface wiring connections, conduit must be installed between the battery cabinet and
the UPS cabinet.
Figure
10) proceed to
Step
5; if wiring the IBC shunt trip interface terminals using the bottom entry
Step
8.
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
Figure 19
for wiring and termination requirements. Refer to the applicable Eaton 93PM UPS
Step
11.
IBC
Step
2; if wiring the IBC shunt trip interface terminals using the
Figure 18
1.7 For More
Information, for UPS cabinet terminal
Figure
15) using Zip ties.
TB2
Figure
Figure
10) of the UPS
Figure
13). Route the wiring along the
for terminal locations. See
10).

Advertisement

Table of Contents
loading

Table of Contents