5.
Top Entry Wiring. Remove the top conduit plate (see
conduit requirements and mark their location. Drill and punch all conduit holes in the top conduit plate prior
to mounting on the IBC. Install the conduit plate and install all conduit runs into the plate. Pull the wiring
through the conduit into the wiring area.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
6.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
top of the IBC to the IBC battery interface terminal block TB2. See
Table
7, and
Figure 19
Installation and Operation manual listed in paragraph
locations.
7.
Proceed to
Step
11.
8.
Bottom Entry Wiring. Remove the bottom conduit plate (see
IBC. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring areas.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
.
9.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
the bottom of the IBC to the wiring channel on the left side of the IBC (see
along the wiring channel to the IBC battery interface terminal block TB2. See
locations. See
Table
7, and
Eaton 93PM UPS Installation and Operation manual listed in paragraph
cabinet terminal locations.
10. Secure the interface wiring to the wire tie anchors (see
11. Connect the battery shunt trip interface wiring to the IBC battery shunt trip interface terminals. See
for termination requirements.
For a detailed view of the IBC terminal block, see
12. Connect the battery shunt trip interface wiring to the UPS battery shunt trip interface terminals. Refer to
the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
1.7 For More
Information, for UPS cabinet termination requirements.
NOTE
In the following step, if the safety shield cannot be reinstalled because of misalignment,
use the leveling feet to realign the cabinet.
.
13. Reinstall the internal safety shield panel removed in
4.3.1 Line-Up-and-Match Power
14. Close the outside door and secure the latch.
15. Once the battery cabinets are installed and wired, return to the applicable Eaton 93PM UPS Installation and
Operation manual, listed in paragraph
Eaton 93PM Integrated Battery Cabinet-Small (IBC-S) Installation Manual 164000305—Rev 06
for wiring and termination requirements. Refer to the applicable Eaton 93PM UPS
Figure 19
for wiring and termination requirements. Refer to the applicable
Figure
Wiring.
1.7 For More
Figure
17) from the top of the IBC. Identify all
Figure 18
for terminal locations. See
1.7 For More
Information, for UPS cabinet terminal
Figure
17) from the inside bottom of the
Figure
Figure 18
1.7 For More
Figure
15) using Zip ties.
20.
Step 3
of paragraph
Information, to complete the UPS wiring.
Installation
Figure
10).
Figure
10).
13). Route the wiring
for terminal
Information, for UPS
Table 8
41

Advertisement

Table of Contents
loading

Table of Contents