8.
Route the thermal sensor interface wiring from the UPS thermal sensor (building alarm) interface terminals
through the bottom of the IBC to the wiring channel on the left side of the IBC (see
wiring along the wiring channel to the IBC battery interface terminal block TB2. See
locations. See
Eaton 93PM UPS Installation and Operation manual listed in paragraph
cabinet terminal locations.
9.
Secure the interface wiring to the wire tie anchors (see
10. Connect the thermal sensor interface wiring to the IBC thermal sensor interface terminals. See
termination requirements.
For a detailed view of the IBC terminal block, see
11. Connect the thermal sensor interface wiring to the UPS thermal sensor interface (building alarm) terminals.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
1.7 For More
NOTE
.
12. Reinstall the internal safety shield panel removed in
4.3.1 Line-Up-and-Match Power
13. Close the outside door and secure the latch.
14. Once the battery cabinets are installed and wired, return to the applicable Eaton 93PM UPS Installation and
Operation manual, listed in paragraph
4 4 . . 5 5
I I n n i i t t i i a a l l S S t t a a r r t t u u p p
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms specified in
contract for the UPS. Contact an Eaton service representative in advance (a minimum two-week notice is
required) to reserve a preferred startup date.
Table
7, and
Figure 19
for wiring and termination requirements. Refer to the applicable
Information, for UPS cabinet termination requirements.
In the following step, if the safety shield cannot be reinstalled because of misalignment,
use the leveling feet to realign the cabinet.
Wiring.
1.7 For More
Chapter 8 Warranty
Eaton 93PM Integrated Battery Cabinet-Small (IBC-S) Installation Manual 164000305—Rev 06
Figure
15) using Zip ties.
Figure
20.
Step 3
of paragraph
Information, to complete the UPS wiring.
become void. This service is offered as part of the sales
Installation
Figure
13). Route the
Figure 18
for terminal
1.7 For More
Information, for UPS
Table 8
for
43