Eaton 93pm Installation Manual page 5

Table of Contents

Advertisement

L L i i s s t t o o f f F F i i g g u u r r e e s s
Figure 1.
Eaton 93PM Integrated Battery Cabinet-Small ...................................................................................... 1
Figure 2.
Eaton 93PM 50 kW or 100 kW UPS and Two 93PM Integrated Battery Cabinets ......................................... 2
Figure 3.
Integrated Battery Cabinet-Small Dimensions (Front and Right Side Views) .............................................. 13
Figure 4.
Integrated Battery Cabinet-Small Dimensions (Top and Bottom Views) .................................................... 14
Figure 5.
Integrated Battery Cabinet-Small Floor Mount Bracket Dimensions......................................................... 15
Figure 6.
Integrated Battery Cabinet-Small Center of Gravity .............................................................................. 16
Figure 7.
Eaton 93PM IBC-S as Shipped on Pallet ............................................................................................ 21
Figure 8.
Eaton 93PM Integrated Battery Cabinet-Small Battery Breaker Locations ................................................. 22
Figure 9.
Removing the Pallet Skids and Supports – Eaton 93PM Integrated Battery Cabinet-Small ............................ 25
Figure 10.
Line-Up-and-Match Wiring Access Locations...................................................................................... 27
Figure 11.
Rear Ventilation ........................................................................................................................... 28
Figure 12.
Top Ventilation............................................................................................................................. 28
Figure 13.
Wiring Channel Location ................................................................................................................ 30
Figure 14.
DC Power Terminal Locations – Eaton 93PM Integrated Battery Cabinet-Small.......................................... 31
Figure 15.
Wire Tie Anchors ......................................................................................................................... 32
Figure 16.
DC Power Terminal Detail – Eaton 93PM Integrated Battery Cabinet-Small............................................... 33
Figure 17.
IBC-S Top and Bottom Entry Conduit and Wire Entry Locations .............................................................. 35
Figure 18.
Interface Terminal Locations – Eaton 93PM Integrated Battery Cabinet-Small ........................................... 38
Figure 19.
Shunt Trip, Battery Detect, and Thermal Sensor Wiring ........................................................................ 39
Figure 20.
Interface Terminal Detail – Eaton 93PM Integrated Battery Cabinet-Small ................................................ 40
Figure 21.
93PM Integrated Battery Cabinet Line-Up-and-Match Power Oneline ...................................................... 47
Figure 22.
93PM Integrated Battery Cabinet Standalone Power Online – One or Two Cabinets ................................... 48
Figure 23.
93PM Integrated Battery Cabinet Standalone Power Online – Three or Four Cabinets ................................. 48
Figure 24.
93PM Integrated Battery Cabinet Interface Oneline ............................................................................. 49
Figure 25.
93PM Integrated Battery Cabinet Schematic...................................................................................... 50
Figure 26.
93PM Integrated Battery Cabinet Battery String Detail Schematic .......................................................... 51
Eaton 93PM Integrated Battery Cabinet-Small (IBC-S) Installation Manual 164000305—Rev 06