4
Mounting
1
Clamp strip
2
Clamp holder
3
Flange and intermediate plate
4
Threaded pin
5
Clamping screw
5. Slide the clamp holders to the profiles and tighten the screws
(tightening torque 1 Nm ±20 %).
6. Remove transport lock.
Keep reusable transport locks and the corresponding screws for future use (maintenance,
dismantling).
7. Position the clamp strips on the clamp holders and insert the screws (è www.festo.com/sp).
8. Assemble the intermediate plate on the flange plate at X-axis 1 (tightening torque 3 Nm ±20 %).
20
5
4
Fig. 4.11
Festo – EXCM-30-EN – 1605b – English
1
2
3