Technical Guideline G13 - RMG TME400-VMF Operating Manual

Turbine meter
Hide thumbs Also See for TME400-VMF:
Table of Contents

Advertisement

1 Introduction
1.4.2.6.
The installation conditions for new systems according to TRG G13 and the facilitated
installation conditions for RMG turbine meters are compared in the table below.
Type of up-
28
stream per-
tubation
none
Bend
Bends in 2
planes
Gas pressure
regulating
device with an
attenuator
Gas pressure
regulating
device without
an attenuator
Diffuser
Diffuser with
swirling flow
Manual TME400-VMF · EN02 · 2018 September 6th

Technical guideline G13

Installation
Installation
conditions
conditions for
according to
RMG type
TR G13
TME400 meters
Inlet  5 DN
Inlet  2 DN
Outlet  2 DN
Outlet  2 DN
Inlet  10 DN
Inlet  5 DN
Inlet  2 DN
Inlet  5 DN
Inlet  2 DN
plus 2 perforated
plate straighteners
or a bend straight-
ener
Inlet  5 DN
Inlet  2 DN
plus 1 perforated
plate straightener
Inlet  5 DN
Inlet  2 DN
plus 2 perforated
plus 1 perforated
plate straightener
plate straightener
Inlet  5 DN
Inlet  2 DN
plus 1 perforated
plate straightener
Inlet  5 DN
Inlet  2 DN
plus 2 perforated
plate straightener
Comments
The outlet pipe can also be designed as a
bend.
Pertubation upstream from this inlet pipe
does not have to be factored in when the
requirements for an alternating and puls-
ing flow are fulfilled.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tme400-vmTme400-vcTme400-vcf

Table of Contents