Siemens MXL-IQ Operation, Installation, And Maintenance Manual page 48

Table of Contents

Advertisement

Installation
Test
5. Activate all status devices on the
System.
6. CRM-4 relays:
Refer to Control Output On/Off, page
3-38, and toggle each CRM-4 relay
assigned to the System.
Reset the System when this test is
complete.
7. CSM-4 relays:
Refer to Control Output On/Off, page
3-38, and toggle each CSM-4 relay
assigned to the System.
Reset the System when this test is
complete.
8. System Functions:
Check all functions that are defined in
the customer specifications.
2-18
• None of the devices should cause an alarm or trouble condition.
• If there is a printer, the System should print the status of report-
ing devices.
• As each device is activated, the custom message recorded on
the printer corresponds to the CSG-M printout for that device.
• Check that all appropriate responses are activated.
• Verifies proper operation of the connected relay.
• Verifies proper operation of the connected relay.
• Check that the correct relationships between initiating devices
and output functions occur as defined by the customer specifica-
tions.
• Check that the appropriate NFPA and local codes are met
(Refer to the CSG-M Logical Function Summary.)
Response

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents