Siemens MXL-IQ Operation, Installation, And Maintenance Manual page 37

Table of Contents

Advertisement

S
E
I R
L A
N I
E T
F R
A
1
B
A
U
D
R
A
E T
6 9
0 0
O
F F
8 4
0 0
O
N
4 2
0 0
O
F F
2 1
0 0
O
N
3
0 0
O
N
D
A
A T
I B
S T
8
7
A P
I R
Y T
v E
n e
O
d d
A P
I R
Y T
D
s i
b a
e l
n E
b a
e l
F
O L
W
C
O
N
R T
L O
a H
d r
w
a
e r
S
f o
w t
a
e r
O P
T R
Y T
E P
NOTE:
When setting Switch S1,
OFF=UP=OPEN
ON=DOWN=CLOSED
PARALLEL PRINTER (REAR VIEW)
120 VAC
60 Hz
CABLE SUPPLIED WITH PIM-2
(SEE NOTE 2)
SUPERVISED
(REFER TO NOTES 9 AND 10)
THE CONNECTION IS NOT
SUPERVISED FOR DATA
INTEGRITY BETWEEN PIM-2
AND THE PRINTER.
Figure 29
PIM-2 to MXL-IQ Wiring Diagram
T
A
B
E L
4
C
E
C
O
M
M
U
N
C I
A
T
O I
N
P
A
R
D
s p i
w
t i
h c
P
s o
i t i
n o
S (
W
) 1
L -
c o
t a
d e
2
3
4
5
O
N
O
F F
O
N
O
F F
O
F F
O
N
O
F F
O
N
O
N
O
N
O
F F
O
N
O
F F
O
N
CENTRONICS PARALLEL
PIM-2 POWER TRANSFORMER
SUPPLIED WITH PIM-2 (SEE NOTE 3)
INSTALL IN UL LISTED GANGBOX
A
M
E
E T
R
S
a
r t
a e
o r
P f
M I
2 -
6
7
8
O
F F
O
N
O
F F
O
N
O
F F
MKB-4
PIM-1
SEE INSTL. INSTR.
P/N 315-091462
TB1
CABLE NOT SUPPLIED
(SEE NOTE 1)
SUPERVISED
PIM-2 (REAR VIEW)
(REFER TO TABLE 4)
OUTPUT
INPUT
XFMR
PIM-2 POWER CABLE
MUST BE IN CONDUIT
NOTES:
1. Maximum cable
2. The maximum distance
3.
4. For NFPA 72 Local,
5.
6. The PIM-2 input and
7. Pressing RESET on the
8. For NFPA Proprietary
ANN-1
9.
10. The PIM-2 is
11. After loading paper in
SW1
PWR
Installation
distance from PIM-1 to
PIM-2 cable is 25 feet.
The two modules must
be in the same room.
from the PIM-2 to the
parallel printer is 6 feet.
The two modules must
be in the same room.
PIM-2 power (PWR) is
connected to the 5
VDC, 600mA trans-
former supplied with the
PIM-2. The transformer
requires 120 VAC, 60
Hz, 0.5A max.
Auxiliary, and Remote
Station configurations,
connect the output of
the PIM-2 to any UL
listed EDP Centronics
parallel printer.
The parallel printer must
support the EPSON FX
command set.
output connectors are
DB-25 female.
PIM-2 causes the unit
to read the SW1
settings. The status
LED is lit when the unit
is powered. Do not use
the COPY button.
and UL 1076
configurations, use
parallel printer Model
PAL-1, a UL listed for
fire Centronics parallel
printer.
The parallel printer is
supervised for AC, on/
off line, paper out, paper
jam, and connection to
the PIM-2.
supervised for power,
connection to the
printer, and connection
to the PIM-1.
the PAL-1 printer, turn
off the power and follow
the steps below:
• While pressing the
LOAD PARK button,
turn on the power to
the PAL-1 printer.
Continue pressing
the LOAD PARK
button for 5 seconds.
• Release the LOAD
PARK button.
• The current setting
will print.
• When printing is
completed, the ON
LINE indicator will be
lit. If the ON LINE
indicator is not lit,
press the ON LINE
button.
2-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents