INSTALLATION

26.1

Unpacking

Remove the meter from its packaging and inspect for damage.
Check that there is no movement or loose parts within the meter enclosure.
If damage has been sustained in transit, an immediate claim should be made to the Transport
Company, and a report sent to the Elster Metering Systems branch office or agent.
Removal of the main cover seals will invalidate certification.
The meter type and rating must be correct for the intended application.
26.2

Handling

Once removed from the packaging, meters must be treated with care and not subjected to
excessive shock or mechanical vibration.
Care should be taken to avoid marking or scratching the meter case and polycarbonate cover.
26.3

Storage

If the meter is not required for immediate use, it should be returned to the original packing
(including plastic bag) and stored in a clean, dry environment.
Storage temperature:
26.4

Installation Site

The installation site should be a dry indoor environment and, as far as is practicable, away from
direct sunlight and free from mechanical shock and vibration.
26.5

Electromagnetic Compatibility (EMC)

The A1120/40 meter has been designed and tested for compliance with the EMC Directive.
It is, however, the responsibility of the installer for ensuring that a system conforms to the
Directive.
WARNING
-25° C to +85° C
Operating & Maintenance Instructions
37