Deferred Tariff And Deferred Tariff Changeover Date; Tariff/Display Scheme Verification; External Registers (Firmware Version C Only) - Elster A1140 User Manual

Programmable electronic polyphase meter
Table of Contents

Advertisement

11.9

Deferred Tariff and Deferred Tariff Changeover Date

A second tariff can be programmed in the meter that will take effect from a programmed date.
An option to perform an End of Billing on the Deferred Tariff Changeover Date is available as part
of the deferred tariff structure.
11.10

Tariff/Display Scheme Verification

The meter generates a checksum (CRC-16) of the tariff/display scheme currently residing in the
meter. The checksum can be included as part of the display sequence, and also compared with a
tariff checksum generated by the Power Master Unit. This allows quick verification, either locally
or remotely, that the correct tariff/display scheme resides within the meter.
12
EXTERNAL REGISTERS
Firmware Version C of the A1120/40 has 12
External Registers that can be used to
display data from an external source such as
a gas or water meter. The registers are
accessed via an intelligent source (such as a
modem) and can be viewed on the A1120/40
meter display.
The registers are configured as three sets,
External set 1, External set 2 and External
set 3.
Each register set has four associated registers and has its own formatting options that can be
configured using the Power Master Unit (Number of digits, Number of decimal places and display
scale).
The Display shows Register 2 of External Set 1
Each register has 16 digits. The user is able to select English text or create an OBIS code for each of
the twelve external registers.
(FIRMWARE VERSION C ONLY)
Operating & Maintenance Instructions
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A1120

Table of Contents