Season Changeover Dates; Exclusion Dates - Elster A1140 User Manual

Programmable electronic polyphase meter
Table of Contents

Advertisement

16
A1120/1140 Programmable Polyphase Meter Users Manual
___________________________________________________________________

Season Changeover Dates

24 Season Changeover Dates
Season Changeover Dates are the dates on which
a new season begins. Season Change Over Dates
are defined by day, month and season number.
Entering the seasons changeover dates
To enter a fixed date - Select the first season then
click on the Season Dates column at the start of the
required Season.
Click and drag to the Season end date
Repeat for all Seasons
Select Scheme/Save page
If a date other than the first day of the month is required for the season start date, click on the 'day' tab
and use the scroll bar to find the start of the season. Click and drag to the Season end date
To enter a variable date - Check Enable Advanced Season
Editing then select the Season.
From the Season Change Editor, select Last Monday in April.
Selecting Next starts on Last Sunday in September.
Select OK.
Note: February 29 will only be activated on leap years even
if selected, otherwise the February 28 will be used.
The calendar can be viewed by day or by month by selecting the
appropriate option at the bottom of the calendar.
Billing Reset
A Billing Reset can be activated by selecting 'perform a billing reset on change season'.

Exclusion Dates

32 Exclusion Dates
Exclusion Dates are the dates when the normal switching times for that season are not to be adopted
i.e. Public Holidays. Instead, Switching times with defined actions take over.
A switching time for the 1 Jan is shown opposite.
The shaded box indicates the season or day to switch to i.e. Holiday
is the day type selected to use.
© Elster Metering Ltd - M181 001 3C - 12/2007

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A1120

Table of Contents