General
If using a transformer-rated meter, make sure the installation current is within the current rating of the AGI RLC assembly.
A transformer-rated meter installation can support higher loads than the current rating of the AGI RLC assembly.
Overheating and equipment damage can result if the installation current exceeds the AGI RLC assembly current rating.
The Advanced Grid Infrastructure (AGI) Remote Load Control (RLC) polyphase interrupter allows the utility to connect or
disconnect three-phase loads up to 480 V. The AGI RLC polyphase interrupter is available with either a 120 A or a 200 A
maximum current rating.
When coupled with an A3 ALPHA meter
or an integrated wireless WAN option board, the AGI RLC can be controlled using the EnergyAxis System. Additionally, the
A3 ALPHA can provide essential metering and monitoring for your remote polyphase loads.
While the AGI RLC polyphase interrupter can be coupled with another controller (such as a third-party device using the
auxiliary control terminals), this leaflet provides general instructions for mounting the polyphase service control device and
placing the A3 ALPHA meter into service.
For instructions on placing the A3 ALPHA meter
IL42-4001Q or later.
For instructions for the A3 ALPHA meter with Wireless WIC into service, see A3 ALPHA meter with wireless
communication option, see IL42-4036A or later.
1
The A3 ALPHA meter is sold separately. For more information, see the "A3 ALPHA meter for use with AGI RLC polyphase
interrupter" data sheet (DS42-1018A or later).
Elster
Raleigh, North Carolina USA
+1 800 338 5251 (US toll free)
+1 905 634 4895 (Canada)
support@us.elster.com
www.elster.com
WARNING
!
1
equipped with either an EnergyAxis
1
into service, see the ALPHA meter installation instruction
AGI RLC polyphase interrupter
For use with A3 ALPHA
System integrated wireless LAN mesh radio
®
IL42-4034D
®
meters

Advertisement

loading

Summary of Contents for Elster AGI RLC

  • Page 1 The Advanced Grid Infrastructure (AGI) Remote Load Control (RLC) polyphase interrupter allows the utility to connect or disconnect three-phase loads up to 480 V. The AGI RLC polyphase interrupter is available with either a 120 A or a 200 A maximum current rating.
  • Page 2: Before You Install

    3-foot or 10-foot contactor status cable (may be shipped inside enclosure assembly) Mounting bracket (optional) Mounting bracket installation materials (may be shipped with mounting bracket) Contact Elster’s support line at +1 800 338 5251 if you do not have all the required materials. Before you install WARNING Use authorized utility procedures to install and service metering equipment.
  • Page 3 February 2012 IL42-4034D Antenna (optional) Hole seal (optional) Enclosure Back panel Mounting bracket (may be shipped separately) Figure 1. AGI RLC polyphase interrupter assembly, isometric view (120 A version shown; 200 A is similar)
  • Page 4 ** Eaton part number: C25KNY9. Part & part number subject to change without notice. † Maximum load for the source terminals is 60 VA. Figure 2. AGI RLC polyphase interrupter components (120 A version shown; 200 A version is similar)
  • Page 5 February 2012 IL42-4034D CLOSED OPEN Green LED Red LED Indicates contactor is open Indicates contactor is closed Power should be absent from load Power should be present at load Figure 3. LED operation (200 A version shown; 120 A version indicators are identical)
  • Page 6 IL42-4034D February 2012 Figure 4. AGI RLC wiring diagram...
  • Page 7 IL42-4034D 14.40 0.39 8.20 diameter 17.50 16.60 3.50 0.39 diameter 2-inch conduit hole 5.25 4.50 2.50 (both sides) 13.00 2-inch conduit hole Approximate dimensions in inches 5.00 3.88 10.11 Figure 5. AGI RLC polyphase interrupter assembly dimensions, 120 A version...
  • Page 8 20.00 11.125 0.53 diameter 26.50 2½-inch conduit hole (both sides) 25.25 5.08 0.53 diameter 6.00 2.50 6.75 16.00 2½-inch conduit hole Approximate dimensions in inches 5.50 4.00 6.96 15.00 Figure 6. AGI RLC polyphase interrupter assembly dimensions, 200 A version...
  • Page 9 Be sure to waterproof conduit entrances (such as, using coax sealant) to help prevent water from entering the enclosure. Be sure to always follow your utility’s guidelines and practices when installing equipment. When installing the AGI RLC, use the following recommended procedures as well as your utility’s guidelines and practices: Mount the enclosure assembly to the pole using your utility’s guidelines and practices.
  • Page 10: Troubleshooting

    Under normal operating conditions, the A3 ALPHA meter will be powered and its LCD will be active. You should be able to use Metercat 3.0 or later to test the connect and disconnect commands for the AGI RLC polyphase interrupter.
  • Page 11 February 2012 IL42-4034D Notes:...
  • Page 12 In no event will Elster be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental, or consequential damage or loss whatsoever, including but not limited to: damage or loss of use of equipment, cost of capital, loss of profits or revenues, or claims against the user by its customers resulting from the use of the information, recommendations, descriptions, and safety notices contained herein.