Test Indication (Manufacturing Option); Additional Voltage Terminals; Load Profile Recording (A1140) - Elster A1140 User Manual

Programmable electronic polyphase meter
Table of Contents

Advertisement

34
A1120/40 - Electronic Polyphase Meter
21.2

Test Indication (Manufacturing option)

The output can be configured at manufacture to generate pulses that replicate the kWh LED or
the kvarh LED.
This option is desirable if meter accuracy verification must be performed without using optical
pickups. When configured in this way the auxiliary output pulse width and LED pulse width are
the same (approximately 6 ms).
22

ADDITIONAL VOLTAGE TERMINALS

As an option the A1120/40 can be supplied with additional terminals that allow external
equipment to be powered from the meter (See Figure 5).
Connections made to these terminals will only be protected by the installation's main fuse cut-
out.
The installer must ensure that additional local protection is provided for any circuits connected
to these terminals.
23

LOAD PROFILE RECORDING (A1140)

The A1140 can be programmed to record up to four values from any of the rising demand registers
at the end of each integration period. Up to 300 days of 30 minute data can be stored for a single
channel. The number of day's storage is reduced if Instrumentation Profiling is configured, the
Number of Channels stored is increased or the Integration Period is reduced.
Integration period - 1, 2, 3, 4, 5, 6, 10, 15, 20, 30, 60 minutes. Common with the demand period.
Load profile data is stored with reference to either base time or daylight saving time.
Base Time - Daylight savings have no effect on the demand period and 48 periods are stored
(assuming 30 minute integration period).
Daylight savings time - When the clock advances, 46 periods will be stored. When the clock
retards, 50 periods will be stored (assuming 30 minute integration period).
© Elster Metering Limited - M181 001 2G - 5/2010
WARNING
4 Demand Values
(kW, kvar, kVA,
Customer Defined)
Demand Period End
Typical Load Profile Recording
Channels Days
1
300
2
300
3
265
4
205
(30 minute integration period)
Power
Master Unit
Readings
Proprietary
Software
Readings

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A1120

Table of Contents