Installation Position, Flow Direction; Installation / Connection - Elster RABO Series Instruction Manual

Rotary gas meters
Table of Contents

Advertisement

6. Installation Position, Flow Direction

Gas can be fed through the RABO rotary gas meter both horizontally and vertically. The
piston shafts and digit rollers on the index must always be aligned horizontally.
The index can be turned through up to 355° for optimum ease of reading in different
installation/operating positions.

7. Installation / Connection

Warning! Never clean the plastic hood of the index with a dry
cloth owing to the risk of explosion resulting from electrostatic
discharge! Please only ever use an adequately water - moistened
cloth!
Before installation please ensure:
-
that the protective caps and/or plastic sheeting is or are removed,
-
that the meter and accessories have been inspected for transport damage,
-
that the pistons rotate easily in the measuring chamber
(e.g. by blowing on them),
-
that the accessories have been checked for completeness
(e.g. plug connectors, oil for initial fi lling).
You will require the following items for installation:
-
Suitable seals/gaskets for the relevant gases.
-
For installing the meter in the pipe, use screws
in accordance with DIN 931. The screw length
must be selected so that a thread reach of
16 - 22 mm into the meter is guaranteed.
The recommended maximum tightening torque
is defi ned in the table.
73021678b
© Elster GmbH • All rights reserved • Subject to technical modifi cation
Elster-Instromet
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rabo g16Rabo g250

Table of Contents