Checklist Before Installation - HP A6616 Installation Manual

Table of Contents

Advertisement

Installation Tools, Meters and Devices
Installation accessories supplied with the router
Power cables
Console cable
PGND cable
Mounting brackets
Cable management bracket
Blank panel
ESD-preventive wrist strap
User supplied tools
Phillips screwdrivers: P1-100 mm, P2-150 mm, and P3-250 mm
Flat-blade screwdriver: P4-75 mm
Screws with various specifications
Various meters and devices, such as hub, configuration terminal, optional modules,
or multimeter.
Optional cables
Reference
When installing or maintaining the router, you can refer to the following documents shipped
with the router:
HP A6616 Router Installation Manual
HP SR6600 Routers Electronic Documentation
Or, you can obtain the latest documents from the documentation center on the website at
http://www.HP.com.

Checklist Before Installation

Table 3-4 Checklist before installation
Installation
site
Item
Ventilation
Temperature
0°C to 45°C (32°F to 113°F)
Relative humidity
10% to 95% (noncondensing)
Dust concentration ≤ 3 × 10
Cleanness
ESD prevention
Requirements
There is a minimum clearance of 10 cm (3.9 in.) around the inlet
vents and exhaust vents for heat dissipation of the router chassis.
A ventilation system is available at the installation site.
4
The equipment and the floor are well grounded.
The equipment room is dust-proof.
The humidity and temperature are at a proper level, respectively.
Wear an ESD-preventive wrist strap and uniform when touching a
circuit board.
Place the removed memory module, CF card, or HIM/MIM on an
antistatic workbench, with the face upward, or put it into an
antistatic bag.
Touch only the edges, instead of electronic components when
observing or moving a removed memory module, CF card, or
HIM/MIM.
3
particles/m

Advertisement

Table of Contents
loading

Table of Contents