Installation accessories
Grounding cable (provided)
M6 screw (user supplied)
Installation checklist
Table 5 Installation checklist
Item
Installation site
Rubber feet (provided)
M4 screw (provided)
Requirements
•
Ventilation
•
Temperature
0°C to 45°C (32°F to 113°F).
Relative humidity
5% to 90% (noncondensing).
•
Cleanness
•
•
•
•
ESD prevention
•
•
•
EMI prevention
•
Cage nut (user supplied)
Mounting brackets (provided)
There is a minimum clearance of 10 cm (3.94 in)
around the inlet and outlet air vents for heat
dissipation of the router chassis.
A good ventilation system is available at the
installation site.
Dust concentration ≤ 3 × 10
visible dust on desk within three days.)
The equipment and floor are reliably grounded.
The equipment room is dust-proof.
The humidity and temperature are at a compliant
level.
Wear an ESD wrist strap and uniform when
touching a circuit board.
Place the removed interface module on an
antistatic workbench, with the face upward, or put
it into an antistatic bag.
Touch only the edges, instead of electronic
components when observing or moving a removed
interface module.
Take effective measures to reduce interference
from the power grid system.
Separate the grounding equipment of the router
from the grounding or lightning protection
grounding equipment of other devices as far as
5
Load-bearing screw (provided)
Result
4
particles/m
3
. (No