Electricity Safety
Locate the emergency power switch in the equipment room before installation and
maintenance so that you can switch the power off in case of an electrical accident. If
necessary, unplug the power cord immediately.
Make sure that the router has been correctly grounded.
Do not open or close the chassis cover when the router is powered on.
Connect the interface cables for the router correctly.
Use laser with caution. Do not directly stare into apertures or fiber-optic connectors
that emit laser radiation.
If you are not using the laser, cover the dust cover to avoid static adsorption, which
may cause damage to the laser.
Equip an uninterrupted power supply (UPS).
Disconnect the two power inputs to power off the router if there are two power
inputs.
Avoid maintaining the router alone when it is powered on.
Installation Tools, Meters and Devices
Installation Accessories Supplied with the Router
AC power cord
Console cable
PGND cable
Front and back rack-mounting ears
User supplied tools
Phillips screwdrivers: P1-100 mm, P2-150 mm, and P3-250 mm
Straight screwdriver: P4-75 mm
Screws with various specifications
Various meters and devices, such as hub, configuration terminal, optional modules,
and multimeter.
Optional cables
ESD-preventive glove, ESD-preventive wrist strap, antistatic bag or mat
Reference
When installing or maintaining the A6602, you can refer to the following documents shipped
with the A6602:
HP A6602 Router Installation Manual
HP SR6600 Routers Electronic Documentation
Or, you can obtain the latest documents from the documentation center on the website at
http://www.HP.com.

Checklist Before Installation

Table 2-4 Checklist before installation
Installation site
Item
Ventilation
Requirements
There is a minimum clearance of 10 cm (3.9 in.) around the inlet
vents and exhaust vents for heat dissipation of the router chassis.