DencoHappel ZGF.1E series Operation Manual page 94

Flex-geko economy series; flex-geko comfort series decentral systems comfort - fan coil units
Table of Contents

Advertisement

Safety and User Instructions
Line lengths
Shielding / Earthing
94
Regardless of the cross section and the number of participants, the maximum line
length including branch feeders must not exceed 600 m. The branch feeder must
not exceed 25 m. The total length of all branch feeders may not exceed a maxi-
mum 150 m.
RECOMMENDATION
Bridges must be used in the network if there are more than 110 users. To
extend the line length, special jumpers are necessary to decouple running
times of telegrams between the network participants.
The cross-section of the bus cable must be changed depending on the
MATRIX.net cable length!
Line length
up to 50 m
up to 600 m
*Contains 2 wires for the voltage supply of the control panels or modules
Install the data transfer cable (MATRIX.Net) on one side in the DencoHappel
air treatment unit using shielding clips to ensure the best possible electrical
contact.
Apply the shielding with the grounding clamps to a large ground area!
In systems with a large network, or if large-scale EMC impairment is likely, the
shielding should be applied on both sides. Ensure beforehand that there are
no differences in potential.
Line type
2 x 2 x 0.22 mm² *
1 x 2 x 0.22 mm²
2 x 2 x 0.5 mm² *
1 x 2 x 0.5 mm²
PR-2011-0115-GB • Subject to modifications • R4-12/2015
Flex-Geko Fan Coil Unit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents