DencoHappel ZGF.1E series Operation Manual page 75

Flex-geko economy series; flex-geko comfort series decentral systems comfort - fan coil units
Table of Contents

Advertisement

Flex-Geko Fan Coil Unit
6.6.2 Mounting control panel outside Flex-Geko
PR-2011-0115-GB • Subject to modifications • R4-12/2015
3
Fig. 6-12: Fixation of the control panel
Front plate of control box
Pos. 1:
Cable
Pos. 2:
Fixation sheet
Pos. 3:
Mounting plate of control panel
Pos. 4:
Front panel of control panel
Pos. 5:
Open the front plate (Fig. 6-12, Pos. 1) of the control box
Pull the cable away from the control panel (Fig. 6-12, Pos. 2) through the
fixation sheet (Fig. 6-12, Pos. 3).
Run the cable along the rear side of the control box to the bottom through the
long hole into the control box.
Use suitable screws to fix the mounting plate of the control panel (Fig. 6-12,
Pos. 4) on the fixation sheet (Fig. 6-12, Pos. 3) of the electrical control box.
First hook the front panel of the control panel in the notches of the mounting
plate and then snap the front cover down into the mounting plate.
If the control panel is mounted on the wall or in a flush mounted socket, consider
the instructions specified in the relevant operation manual. Data on the control
panel like changing mechanical limitation of speed selection switch as well as the
corresponding drill template are contained in this document.
2
Safety and User Instructions
5
4
1
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents