GE C70 Instruction Manual page 431

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

8 THEORY OF OPERATION
b) BALANCED CASE
To understand phase current unbalance protection, first note that the currents are driven by the individual admittances in
each string:
In the above equations, I
base
same per-unit base used by the C70. Voltages are expressed in primary volts, capacitances in Farads, and frequency in
radians per second.
The differential current is the vector difference between the two currents:
The total phase current is the vector sum of the two currents:
Inserting equation 8.46 into equation 8.45, to eliminate the voltages, we get:
Inserting this value into equation 8.43, we have:
The capacitor bank leg-A inherent unbalance factor setting k
As can be seen from the previous two equations, the initial operating signal will be zero.
c) SENSITIVITY
Now consider the consequences of an element failure in a typical string, say string A1, making a small capacitance change
in C
capacitance. The effect on the operating signal can be calculated by taking the derivative of equation 8.48 with
A1
respect to C
.
A1
In the general case, the derivative of the absolute value function is messy, but in our case where the initial value is zero, the
derivative of the absolute function is simply the absolute value of the derivative of its argument. We assume here that I
constant, which investigation has shown results in negligible error. The derivative is thus:
GE Multilin
jC
V
V
A1
A
X
----------------------------------------- - ; I
I
=
A1
I
base
represents the differential CT primary current rating. This places the string currents on the
I
I
I
=
 
DIF A
A1
A2
j V
A
-------------------------------------------------------------- -
=
I
I
I
=
+
A
A1
A2
j V
V
A
---------------------------------------------------------------
=
I
I
I
=
 
DIF A
A
I
I
=
 
 
OP A
DIF A
C
A1
-------------------------- -
I
=
A
C
A1
C
A1
-------------------------- -
k
=
A
C
A1
C70 Capacitor Bank Protection and Control System
jC
V
V
A2
A
X
----------------------------------------- -
=
A2
I
base
 C
V
C
X
A1
A2
I
base
 C
C
+
X
A1
A2
base
C
C
A1
A2
-------------------------- -
C
C
+
A1
A2
k
I
A
A
C
A2
k
I
A
A
C
+
A2
is chosen to be:
A
C
A2
C
+
A2
8.1 OVERVIEW
(EQ 8.44)
(EQ 8.45)
(EQ 8.46)
(EQ 8.47)
(EQ 8.48)
(EQ 8.49)
8
is
A
8-11

Advertisement

Table of Contents
loading

Table of Contents