GE C70 Instruction Manual page 174

Capacitor bank protection and control system
Hide thumbs Also See for C70:
Table of Contents

Advertisement

5.2 PRODUCT SETUP
The report control configuration settings are shown below:
PATH: SETTINGS
PRODUCT SETUP
CONFIGURABLE REPORT 1
 REPORT 1
 DATASET ITEMS
To create the dataset for logical node LN, program the
attributes supported by the C70. Changes to the dataset will only take effect when the C70 is restarted. It is recommended
to use reporting service from logical node LLN0 if a user needs some (but not all) data from already existing GGIO1,
GGIO4, and MMXU4 points and their quantity is not greater than 64 minus the number items in this dataset.
5
5-50

COMMUNICATIONS
REPORT 1 DATASET ITEMS
ITEM
1:
ITEM
2:
MESSAGE
ITEM
3:
MESSAGE
ITEM 64:
MESSAGE
C70 Capacitor Bank Protection and Control System


IEC 61850 PROTOCOL
Range: all valid MMS data item references
Range: as shown above
Range: as shown above
Range: as shown above
to
settings to a value from the list of IEC 61850 data
ITEM 1
ITEM 64
5 SETTINGS
REPORT CONTROL CONFIGURATION
GE Multilin