Body (Temporary)
5
Tape measure,
/
Body, Secondary body fasteners assembly.
Check the location of the jack stands on the frame. The body will come down so that it is flush with the
bottom of the frame. If necessary move the jack stands so they will not hit.
" drill bit, (2) Jack stands, extra person, clamps,
16
www.factoryfive.com
3
355
508-291-3443
" hex key, floor jack
/
16