Retighten the jam nut.
Toe Link
Attach the Toe link arm to the spindle using the M14 x 80mm bolt and locknut.
Repeat for the right hand side.
Use the torque specifications page at the back of the instructions to torque the control arm to spindle bolts.
Coil-Over Shock Assembly
Snap ring pliers, ¾" wrench, ¾" socket, Ratchet, floor jack
Shock set, Insulated clip hardware.
The shocks are pre-valved at the factory in compression and rebound for good street use. The shocks
can be adjusted in rebound as per Koni's instructions if so desired.
Hot Rod IRS springs are 300#.
WARNING! Incorrect assembly and maintenance of this part can cause serious injury or death.
If using the silver double adjustable shocks, these must be mounted with the body of the shock down.
97
www.factoryfive.com
508-291-3443