3
Preparing the SCOPIA TIP Gateway Setup
Perform the procedures in this section to prepare the site and device for installation.
Checking Site Suitability
Prior to installing the you need to verify your site suitability for:
Read the to learn about these requirements. Ensure to make necessary changes in case you
find that the site does not meet any of the requirements described in that section.
Unpacking the Device
We strongly recommend that you follow safety guidelines described in this section during
unpacking.
Procedure
Step 1
Step 2
RADVISION | Deployment Guide for SCOPIA TIP Gateway Version 8.0
•
Checking Site Suitability .................................................................... page 8
•
Unpacking the Device ....................................................................... page 8
•
Inspecting for Damage ...................................................................... page 9
•
Verifying Rack Suitability .................................................................. page 10
•
System power requirements
•
System environmental requirements
•
The device physical dimensions
Inspect the shipping box to verify that it is not seriously damaged during shipping.
Place the shipping box on a horizontal surface paying attention to the This Side Up symbol on
the shipping box. See
Figure 3-1 on page
9.
Preparing the SCOPIA TIP Gateway Setup | 8