Preparing The Scopia Tip Gateway Setup; Checking Site Suitability; Unpacking The Device - RADVision SCOPIA TIP Deployment Manual

Hide thumbs Also See for SCOPIA TIP:
Table of Contents

Advertisement

3

Preparing the SCOPIA TIP Gateway Setup

Perform the procedures in this section to prepare the site and device for installation.

Checking Site Suitability

Prior to installing the you need to verify your site suitability for:
Read the to learn about these requirements. Ensure to make necessary changes in case you
find that the site does not meet any of the requirements described in that section.

Unpacking the Device

We strongly recommend that you follow safety guidelines described in this section during
unpacking.
Procedure
Step 1
Step 2
RADVISION | Deployment Guide for SCOPIA TIP Gateway Version 8.0
Checking Site Suitability .................................................................... page 8
Unpacking the Device ....................................................................... page 8
Inspecting for Damage ...................................................................... page 9
Verifying Rack Suitability .................................................................. page 10
System power requirements
System environmental requirements
The device physical dimensions
Inspect the shipping box to verify that it is not seriously damaged during shipping.
Place the shipping box on a horizontal surface paying attention to the This Side Up symbol on
the shipping box. See
Figure 3-1 on page
9.
Preparing the SCOPIA TIP Gateway Setup | 8

Advertisement

Table of Contents
loading

Table of Contents