Installation Of The Side Cover - Barco HDF-W30LP User And Installation Manual

Hdf wlp series
Table of Contents

Advertisement

a) first hook in the side of the front cover at the front filter,
b) then gently push the other side of the front cover into position,
c) ensure that the locking studs in the corners click into their receivers.
Image 22-9
Front cover installation
4. Secure the front cover by locking the captive screw in the middle at the bottom of the front cover.
Image 22-10
Front cover, dust ring
5. Reinstall the rubber dust ring around the lens holder.

22.6 Installation of the side cover

W
ARNING
Necessary tools
7 mm flat screw driver.
How to install the side cover
1. Check if all needed filters are present.
2. Check the pressure indicated on the internal manometer of the liquid cooling circuit. This pressure should be between 0,5 and 1
bar. If the pressure is out of range, inform the responsible and qualified technician, so he may take necessary corrective action.
R5906730 HDF WLP SERIES 01/08/2017
:
This procedure may only be performed by qualified technical service personnel.
22. Removal and installation of the projector covers
283

Advertisement

Table of Contents
loading

Table of Contents