Siemens SINUMERIK 840D sl Operating Manual page 211

Sinumerik integrate create myconfig - diff, expert, topo
Hide thumbs Also See for SINUMERIK 840D sl:
Table of Contents

Advertisement

Creating a step link
Procedure
The following shows how a step is copied from a subproject (SP) and inserted into a main
project (MP) as link.
1. In the Steps tab in a project of your choice that you would like to use as a subproject (SP),
select a step and use Ctrl+C or the context menu to copy it.
Figure 4-54
Note
Drag and drop is not supported when linking steps.
2. Open the main project (MP) and use Ctrl+V to insert the step or use the context menu as
shown below.
The insertion can be in the level or in the sub level.
SINUMERIK Integrate Create MyConfig - Diff, Expert, Topo
Operating Manual, 11/2016, A5E36537479B-AD
Copy link step
Create MyConfig - Expert
4.4 Project folder
211

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 828d

Table of Contents