Siemens 7SJ82 Manual page 489

Siprotec 5 overcurrent protection
Table of Contents

Advertisement

[loinru05-240211-01.tif, 1, en_US]
Figure 6-84
Logic of the Inrush-Current Detection
The following logic diagram shows the link of the 2 methods of measurement Harmonic Analysis and CWA
method.
The crossblock function influences the Harmonic Analysis process. If you have set the parameter Cross-
blocking to yes, you will receive in the event of threshold-value violation a blocking indication for all 3
phase currents and the measured or calculated zero-sequence current (l
tion works via a timer. Set parameters for the time depending on the expected duration factor via the param-
eter Crossblocking time.
If the phase current exceeds the maximum permissible current Operat.-range limit Imax, the inrush-
current detection will be blocked.
SIPROTEC 5, Overcurrent Protection, Manual
C53000-G5040-C017-8, Edition 07.2017
Logic of the CWA-Method Function (T = 1 Period)
Protection and Automation Functions
6.8 Inrush-Current Detection
/ l
). The crossblock func-
2nd harm
1st harm
489