Figure 38: Marking The Locations Of The Bracket Holes On A Concrete Wall - Allied Telesis AT-x550-18XTQ Installation Manual

X550 series, stackable 10gigabit intelligent access ethernet switches alliedware plus
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Chapter 5: Installing the Switch on a Wall
82
Figure 38. Marking the Locations of the Bracket Holes on a Concrete Wall
4. Place the switch on a table or desk.
5. Use a drill and 1/4" carbide drill bit to pre-drill the four holes you
marked in step 3. Please review the following guidelines:
Prior to drilling, set the drill to hammer and rotation mode. The
modes break up the concrete and clean out the hole.
Allied Telesis recommends cleaning out the holes with a brush or
compressed air.
6. Insert the four anchors into the holes.
7. Have another person hold the switch at the selected wall location while
you secure it to the wall with the four M4x32mm provided screws.
Refer to Figure 39 on page 83.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x550-18xsq

Table of Contents