Release Tab
Figure 58. Installing the AT-QSFPCU Cable in Slot 21
5. Repeat this procedure to install the second cable in QSFP+ slots 21
and 17 in the two switches.
6. Go to Chapter 8, "Powering On and Verifying the Stack" on page 105.
Note
To remove the connector and cable from the slot, gently push on the
connector, pull on the release tab, and slide the connector from the
slot.
x550 Series Installation Guide for Virtual Chassis Stacking
103