Chapter 3 - Installing The Devices - DFI OPS100-SH User Manual

Hide thumbs Also See for OPS100-SH:
Table of Contents

Advertisement

Chapter 3 - Installing the Devices

Installing the OPS100-SH into a Display
Observe the following precautions and guidelines before starting any installation procedures
described in this chapter:
1.
Make sure the system and all other peripheral devices connected to it have been powered-
off.
2.
Disconnect all power cords from all power sources and cables. Failure to disconnect power
before you open the system or perform any procedures can result in or electrical shock or
equipment damage.
Integrating a computing system into a digital signage display is made easy by standardizing the
connectors and signals between an OPS+ Module and an OPS-compliant display.
Note that the OPS+ Module does not support hot swapping; do not power on the display before
the installation is complete. Please use the following steps to install the OPS+ Module into the
display panel:
1.
Align the OPS+ Module with the slot of the display and slide the module into the slot. Note
that the venting holes should face outward to allow ambient airflow.
Venting area of the panel
Chapter 3 Installing the Devices
Chapter 3
2.
Secure the module by attaching two screws on the front panel.
3.
Power on the display panel. The OPS+ Module should be automatically powered on.
Venting holes
Note:
The location of the OPS slot may be at the side or at the bottom of the display panel
depending on the design.
11
Mounting screw holes
www.dfi.com

Advertisement

Table of Contents
loading

Table of Contents