Manage The Dlp; Run A Dlp Self Test; Download An Icp Certificate; Disable The Icp Signature Test - Christie CP42LH User Manual

Hide thumbs Also See for CP42LH:
Table of Contents

Advertisement

Manage the DLP

This section provides procedures for managing the Integrated Cinema Processor (ICP) electronics.
To access the DLP menus, you need Administrator or Service permissions.

Run a DLP self test

Run a DLP self test to test the functionality of the Integrated Cinema Processor (ICP) and DLP.
1. Tap Menu > Diagnostics > DLP Management.
2. Tap DLP Self Test.
3. Tap Yes.
4. To close the Results pane, tap Clear Results.

Download an ICP certificate

1. Insert a USB flash drive in the USB port on the side of the touch panel controller (TPC).
If you do not insert a USB flash drive, the ICP certificate is saved to the FTP root directory.
2. Tap Menu > Diagnostics > DLP Management.
3. Tap Download ICP Certificate.
4. Tap Close.

Disable the ICP signature test

Error messages appear when the ICP is turned on and the ICP signature test is run. They can
disrupt projector network monitoring. Use this procedure to disable the signature test.
1. Tap Menu > Diagnostics > DLP Management.
2. Tap Bypass Signature Test.
3. Tap Yes.
4. To re-enable the ICP signature test, clear the Bypass Signature Test checkbox.
CP42LH User Guide
020-101363-03 Rev. 1 (08-2016)
33

Advertisement

Table of Contents
loading

Table of Contents