750/760
S7 Control
Feeder Management Relay
FIGURE 5–59: Setpoint Control (3 of 3)
Each setpoint group includes the selection of Auxiliary Output Relays 3 to 7
that can be operated by the protection features. As these relays are hard-
wired to external equipment, the selection should only be changed from
CAUTION
that in setpoint Group 1 with considerable care.
GE Multilin
5–99
http://www.GEmultilin.com