Approvals - GE 750 Instruction Manual

Feeder management relay
Hide thumbs Also See for 750:
Table of Contents

Advertisement

750/760
Feeder Management Relay

Approvals

2–14
SIMULATION
Programmable pre-fault, fault, and post-fault
parameters simulation modes. Simulation of
circuit breaker and selection of whether or
not to operate outputs relays.
APPROVALS
ACA:
Tick mark
RF Emissions for Australia
CE:
Conforms to IEC 1010-1 / EN
50082-2
EN:
EN 50623
EMC - CE for Europe
FCC:
Part 15; RF Emissions for
North America
IEC:
IEC 1010-1
LVD - CE for Europe
ISO:
GE Multilin's Quality
Management System is
registered to ISO9001:2000
QMI # 005094
UL #A3775
UL:
UL listed for the USA and
Canada, E83849
Specifications subject to change without notice.
NOTE
It is recommended that all relays must be powered up once per year,
for one hour continuously, to avoid deterioration of electrolytic
capacitors and subsequent relay failure.
NOTE
http://www.GEmultilin.com
Specifications
PRODUCTION TESTS
Thermal cycling: Operational test at ambient,
reducing to –40°C and then
increasing to 60°C
Dielectric strength: On CT inputs, VT inputs,
Control Power inputs, Switch
inputs, Coil Supervision
outputs, and Relay outputs
(2 kV AC for 1 minute) to
Safety Ground.
GE Multilin

Advertisement

Table of Contents
loading

This manual is also suitable for:

760

Table of Contents