High Pressure Leak; Oxygen High Pressure Leak; Nitrous Oxide High Pressure Leak - Dräger Narkomed 2B Service Manual

Anesthesia system
Hide thumbs Also See for Narkomed 2B:
Table of Contents

Advertisement

PMC PROCEDURE (continued)

6.13 HIGH PRESSURE LEAK

( ) 6.13.1

Oxygen High Pressure Leak

6.13.1.1
6.13.1.2
6.13.1.3
6.13.1.4
6.13.1.5
6.13.1.6
6.13.1.7
( ) 6.13.2

Nitrous Oxide High Pressure Leak

6.13.2.1
6.13.2.2
6.13.2.3
6.13.2.4
6.13.2.5
6.13.2.6
6.13.2.7
6.13.2.8
6.13.2.9
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
Verify the System Power switch is at STANDBY.
Open one (1) oxygen cylinder valve.
Let the pressure stabilize.
Close the oxygen cylinder valve and remove the cylinder.
Observe the oxygen cylinder pressure gauge.
After two (2) minutes, what is the pressure loss? ___ PSI (<50)
Attach the cylinder.
Turn the System Power switch to ON.
Open one (1) oxygen cylinder valve and one (1) nitrous oxide
cylinder valve.
Adjust the oxygen flow to 4 l/min.
Let the pressure stabilize.
Close the nitrous oxide cylinder valve and remove the cylinder.
Observe the nitrous oxide cylinder pressure gauge.
After two (2) minutes, what is the pressure loss? ___ PSI (<50)
Attach the cylinder.
Close the oxygen flow control valve.
6-28
RETURN TO CD-ROM TABLE OF CONTENTS
NM2B
Rev. Y

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents