RETURN TO THIS MANUAL'S TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTS
REPLACEMENT PROCEDURES (continued)
NM2B
4.25.11 Place the monitor box top shelf into position, connect its ground wire
to the chassis ground tab, and reinstall the top shelf screws.
4.25.12 Reset the circuit breakers at the back of the monitor box.
4.25.13 Perform the PMS Procedure given in Section 6.
Rev. A
4-88