ADJUSTMENT AND CALIBRATION PROCEDURES (continued)
5.1.13
Replace the acorn nut on the bottom of the regulator.
5.1.14
Close the cylinder valve and allow pressure to drain from the system.
5.1.15
Close all of the flow control valves and set the System Power switch
to STANDBY.
5.1.16
Disconnect the test gauge from the TEE fitting and replace the plug
in the fitting.
5.1.17
Replace the table top and its retaining screws.
5.1.18
Replace the top drawer in the cabinet.
5.1.19
Connect the pipeline hoses.
5.1.20
Perform the PMS Procedure given in Section 6.