Pay Attention! • At least two people are required to safely mount the system in the rack. • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation.
Page 7
Connector (Front) Side FRU (Rear) Side Managed Systems Externally Managed Systems * It may take up to five minutes to turn on the system. If the System Status LED shows red after five minutes, unplug the system and contact your Mellanox representative. ** Certain systems have a single management port.
LED Assignments Configuration 1. Connect the host PC to the Console (RJ-45) port. 2. Configure a serial terminal program. Parameter Settings Baud rate 115200 Data bits Stop bits Parity None Flow control None 3. Log in: Username Password MLNX-OS admin admin 4.