Switch Components - Mellanox Technologies Switch-IB User Manual

324-port edr infiniband switch-ib series switch platform hardware
Table of Contents

Advertisement

It is highly recommended that the installation site building be equipped with a light-
ning rod.
It is highly recommended that the installation site be equipped with smoke detectors
and a fire alarm warning system.
The system requires a KVA rated UPS system. It is recommended that a UPS system
be installed to protect the equipment in the event of unexpected power failure.
Make sure that the outlets and circuits will not be overloaded. Spread out the load over
at least two or three circuits or use a 3 phase circuit.
2.3

Switch Components

The system's components are shipped as specified below.
Chassis Crate
The switch system chassis is shipped in a dedicated crate which includes the following boxes:
1. Switch system chassis with the leaf fan and power supply modules already installed.
2. Chassis installation kit (see
3. Cable holders (see
4. One box containing 6 smaller boxes with cable shelves
5. 1 box containing 104 power cords (250V 16A 2m, C19 to C20, USA UL Standard)
The management, spine, and leaf modules are shipped separately.
To completely populate the CS7500 chassis, one requires 2 management module
boxes, 18 spine module boxes, and 18 leaf module boxes.
Mellanox Technologies
Table 5, "Chassis Installation Kit Items," on page
Table 6, "Cable Management Installation Kit Parts," on page
Installation
29)
31)
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switch-ib 2

Table of Contents