Figure 61: Intact Management Power Pins; Figure 62: Management Module Insertion - Mellanox Technologies Switch-IB User Manual

324-port edr infiniband switch-ib series switch platform hardware
Table of Contents

Advertisement

Start with the ejector handles fully open; that is, at 45 degrees to the front panel of the man-
Step 5.
agement.
Holding the management by its sides, carefully set the management module halfway into
Step 6.
the chassis.
Using only the ejector handles, slowly slide the module into the chassis until the hooks
Step 7.
reach the vertical bar.
Catch the ejector handle hooks onto the vertical bar of the chassis and push the ejector han-
Step 8.
dles shut
Lock the ejector handles onto the module.
Step 9.
Mellanox Technologies

Figure 61: Intact Management Power Pins

Do not apply excessive force to slide in the management module. If you feel resis-
tance, remove the management and double check both the chassis and management
module for any damage.
(Figure
62).

Figure 62: Management Module Insertion

On switch systems with dual management systems, first connect the cable and configure
the master management module and only then configure the slave. By default the master
is the top management module. For further information on the master and slave roles,
see section "Subnet Manager (SM) High Availability (HA)" of the
Manual.
Installation
Vertical
Ejector han-
dle hooks
Locking mecha-
Ejector han-
MLNX-OS®
User
73