Installing the RS4000
Mounting Below a Suspended Ceiling
The optional suspended ceiling mounting kit allows the RS4000 mounting bracket to
attach to suspended ceiling T-rails (see
Note:
to attach the RS4000 to the mounting bracket.
Figure 9: Mounting the RS4000 Below a Suspended Ceiling Rail
To mount an RS4000 below a suspended ceiling:
1. Determine the location on the ceiling rail where the RS4000 will be mounted and
2. Place each of the two caddy fasteners on the ceiling T-rail and twist to attach to
3. Adjust the distance between the caddy fasteners by using the mounting bracket
4. Tighten the caddy fasteners in place using a standard screwdriver. Do not
5. Place each spacer on the caddy fastener stud. The spacer legs should contact the
6. Align the mounting bracket keyholes with the caddy fastener studs and slide the
18
Meru Access Point and Radio Switch Installation Guide
To comply with NEC code, attach a grounding wire to any of the screws used
remove the ceiling tiles.
the rail.
holes as a guide.
overtighten.
ceiling T-rail.
RS4000 to the narrow end of the hole.
Figure
Ceiling tile fastener
Mounting bracket
Washers
9).