Securing Structures to the Floor
(Non-Seismic Applications, see page 25 for
Seismic Applications)
© 1999–2012 Schneider Electric All Rights Reserved
4. Locate two clearance holes for 1/4-20 hardware on the inside surface of
the top section side channels. The front clearance hole is in the left
section and is accessible after removal of the top wireway cover (see
Figure 11F on page 22).
5. The rear clearance hole is in the right section. In most cases, it will be
necessary to remove the section back plate or the top plate to gain
access to the rear clearance hole and install the screw (see Figure 11G).
Fasten each section to the floor (see Figure 12) using 1/2 in. or 3/4 in.,
grade 5 or higher, bolts, and flat washers (furnished by customer).
0.88 in. (22 mm) diameter base channel mounting holes provide clearance
for bolt expansion anchors for 1/2 in. bolts.
NOTE: Although sections are free-standing, floor fastening prevents
movement, thereby preventing conduit connection damage.
Figure 12:
Standard Base Channel Mounting
10.00
(254)
2.50
10.00
(64)
(254)
20 Wide x 15 Deep
(508)
(381)
Figure 13:
Base Channel Mounting For 18-Pulse AC Drive MCC
Sections
65 in. (1651 mm) Wide X 20 in. (508 mm) Deep
2.50
(64)
A
2.50
5.00
(64)
(127)
50 in. (1270 mm) Wide X 20 in. (508 mm) Deep
2.50
(64)
A
2.50
5.00
(64)
(127)
Structure anchoring
A
locations (typical of 4)
Model 6 Motor Control Centers
Section 4—Installing the MCC
15.00
(381)
2.50
10.00
(64)
(254)
20 Wide x 20 Deep
(508)
(508)
Dual dimensions: Inches
55.28
(1404)
40.22
(1021)
Dual dimensions: Inches