Figure 7: Required Obstruction-Free Area - Hach sc200 User Manual

Hide thumbs Also See for sc200:
Table of Contents

Advertisement

80459-641-01E
10/2012
Aligning the MCC
© 1999–2012 Schneider Electric All Rights Reserved
BURN HAZARD FROM HOT GASES
• Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. See NFPA 70E or CSA Z462.
• Keep the area directly above the equipment clear and unobstructed for
a distance of 28.5 in. (724 mm) from the roof.
Failure to follow this instruction will result in death or serious injury.
See figure 7 for the required area above the arc-rated MCC that must be
free from obstructions.
Figure 7:
Required Obstruction-Free Area
14.24 in.
(362 mm)
Obstruction-free
area
Front
of MCC
MCCs are assembled in the factory on a smooth, level surface to ensure proper
alignment of all sections. A similar smooth, level surface should be provided for
installation. An uneven foundation may cause misalignment of shipping blocks,
units, and doors. The surface under an MCC must be of a non-combustible
material, unless bottom plates are installed in each vertical section.
Model 6 Motor Control Centers
Section 4—Installing the MCC
DANGER
Ceiling or other
obstruction
above MCC
28.5 in.
(724 mm)
Minimum
120 in.
(3048 mm)
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents