Monitoring/Test; Monitor/Test Screen - Mitsubishi Electric Q66DA-G User Manual

Channel isolated digital-analog converter module
Hide thumbs Also See for Q66DA-G:
Table of Contents

Advertisement

5
UTILITY PACKAGE (GX Configurator-DA)
5.6

Monitoring/Test

5.6.1
[Purpose]
[Operating procedure]
[Setting screen]
5
- 20
5.6 Monitoring/Test

5.6.1 Monitor/test screen

Monitor/test screen
Start buffer memory monitoring/testing, I/O signal monitoring/testing, operating condi-
tion setting, offset/gain settings (refer to Section5.6.2) and pass data (refer to Sec-
tion5.6.3) from this screen.
"Select monitor/test module" screen
model name"
*1 Enter the start I/O No. in hexadecimal.
The screen can also be started from System monitor of GX Developer Version 6 or
later.
Refer to the GX Developer Operating Manual for details.
X/Y monitor/test
*1
"Start I/O No.
"
"Module type"
Operating setting
"Module
1)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents